Kuala Lumpur Convention Centre (KLCC)
Kuala Lumpur City Centre
50088 Kuala Lumpur
Malaysia
Opening Hours
11.00 am – 6.00 pm daily (10 - 12 June 2008)
11.00 am – 5.00 pm daily (13 June 2008)
The Real Instrumentation and Process Control Engineering Blog Purposely Built for Education.
4 - 6 April 2008 11:00 am - 9:00 pm | Persada Johor International Convention Centre, Johor Bahru, Johor Jalan Abdullah Ibrahim, 80000 Johor Bahru Dewan Perbandaran Taiping, Taiping, Perak Jalan Taming Sari, 34000 Taiping Level 5, Permata Car Park Building, Kuching, Sarawak Jalan Padungan, 93100 Kuching Dewan Masyarakat Sandakan, Sandakan, Sabah Jalan Leila, 90000 Sandakan Dewan Masyarakat Tawau, Tawau, Sabah Jalan Bakau, 91000 Tawau |
11 - 13 April 2008 11:00 am - 9:00 pm | KL Convention Centre, Kuala Lumpur Kuala Lumpur City Centre, 50888 Kuala Lumpur Stadium Indera Mulia, Ipoh, Perak Jalan Stadium Perak, 31400 Ipoh Berjaya Megamall, Kuantan, Pahang Jalan Tun Ismail, Sri Dagangan, 25000 Kuantan Dewan Milenium, Kepala Batas, Penang Bertam, 13200 Kepala Batas Dewan Jubli Intan Sultan Ibrahim, Muar, Johor Jalan Arab, 84000 Muar |
18 - 20 April 2008 11:00 am - 9:00 pm | Penang International Sports Arena, Penang Jalan Tun Dr Awang, 11900 Relau Mahkota Parade Melaka, Melaka Jalan Merdeka, 75000 Bandar Hilir Sibu Trade & Exhibition Centre, Sibu, Sarawak Power Road, 96000 Sibu Miri Indoor Stadium, Miri, Sarawak Jalan Sukan, 98000 Miri Dewan Merdeka MPM, Seri Manjung, Perak Jalan Pinang Raja, 32040 Seri Manjung |
No | Description | P/N |
1 | CLOP Module | 702.617 |
2 | Sample Gas Filter | 317.476 |
3 | Air Intake Filter | 317.430 |
4 | Pump Assembly | 703.630 |
5 | Pump Head | 317.553 |
6 | Viton Diaphragm | 317.552 |
7 | Main Board 702.613 | 702.613 |
8 | Peri Pump 801401 not 317.474 | 703.443 |
9 | Autoprene Tube | 317.480 |
10 | Changeover S/V 703.444 | 703.444 |
11 | uP Board 702.709 | 702.709 |
12 | Cooler Assembly 702.657 | 702.657 |
13 | 4200 Display PCB | 703.066 |
14 | 4200 Detector PCB | 703.067 |
15 | O2 sensor | 702.502 |
16 | NO Sensor | 702.518 |
17 | CO Sensor | 702.818 |
18 | SO2 Sensor | 704.007 |
19 | NO2 Sensor | 704.011 |
Item : Proximity Transducer, Metric |
Manufacturer : Bently Nevada |
Type : 4 x water proof with IP66 |
Part No : 330800 - 16 - 45 - 75 - 01 - 02 |
Proxpac model no : 143619 - 01 |
Output resistance : 50 ohm |
Power supply : 24 Vdc |
Probe gap : 1.27 mm ( 50 mil ) |
No | Description | P/N |
A) Land Chiller Probe TM Spare Parts | ||
1 | 9" 1u Ceramic Filter Element | 317.606 |
2 | Viton Probe 'O' Rings (2 required) | 323.271 |
3 | Viton Large Probe 'O' Rings for filter end cap | 323.272 |
4 | 2u Filter for Water Slip Sensor, Porous Teflon | 323.320 |
5 | Peristaltic Pump Assembly | 317.621 |
6 | Peristaltic Pump Rotor | 802.430 |
7 | Tubing for Peristaltic Pump | 317.622 |
8 | Kalrez Filter O-Ring for 280ºC | 323.273 |
9 | Kalrez O-Ring for Probe Cap for 280ºC | 323.274 |
10 | Communications PCB | 323.330 |
11 | Peltier Cooler Assembly | 323.331 |
12 | Impinger | 323.333 |
13 | Impinger Cover 'O' Ring | 323.334 |
14 | Heated Filter Assembly | 323.335 |
15 | Insulating Jacket for heated filter | 323.336 |
16 | Heater Thermocouple | 323.370 |
17 | Blow Back Solenoid Valve Coil | 323.341 |
18 | Probe Filter | - |
19 | Chiller probe consumable spare kit | 775.018 |
B) Land Model 4200 Dust/Opacity |
ITEM:
MODEL : V8 A09P
MAKER: W.E.
LENGTH OF FLAP: 80MM
POWER SUPPLY: 125/250 VAC, 5 AMP
OUTPUT: 4-20 mA, 2
1. Type of PC: HP or Dell workstation (eg. HP Workstation Model XW4400)
2. Processor: Intel Core 2 Duo
3. RAM: 2 x 1GB, total: 2 GB RAM
4. Hardrive: 2 x 160GB HHD (sata) - mirror partition
5: Optical Drive: DVD +/- RW DL LightScribe
6: Power supply: 90 - 265 Vac
7: Operating system: XP or compatible
8. Network interface: 10/100 RJ45 & BNC connection
9. Chassis type: Minitower
10. Application software: Microrec Maintenance plus configurator
11. To transfer all Microrec data from existing workstation to new workstation
12. Warranty
"KOTA KINABALU: Sabah has decided to scrap the controversial RM1.3bil coal-fired power plant and has directed Tenaga Nasional Berhad to look for alternate sources of energy for the state.
Chief Minister Datuk Musa Aman announced the decision of the state cabinet not to proceed with the 300MW independent power plant as it agreed with the concerns of environmentalists.
“After weighing the pros and cons, the cabinet decided to do away with the proposal because we do not want to risk the welfare of the communities in the area including their health and any adverse impact on the environment,” he said on Wednesday.
He said the proposed plant in Silam was close to the world renowned Danum Valley, Maliau Basin, Darvel Bay and Ulu Segama that are pristine areas with highly sensitive ecosystems.
“We cannot allow for such a plant to be built because these conservation areas have been designated as eco-tourism sites under the Sabah Development Corridor,” he added.
The Star first reported in 2006 the environmentalist opposition to the power plant that was a joint venture between Tenaga Nasional’s subsidiary Sabah Electricity Sdn Bhd and Yayasan Sabah that formed a company Lahad Datu Energy Sdn Bhd for the venture.
The plant was to be sited at Yayasan’s abandoned 128.7ha seafront Pacific Hardwood integrated complex that sits at the entrance of Danum Valley along the Darvel Bay known for its diverse marine life.
The detailed EIA report has also been completed by Ecotone Environmental Management Sdn Bhd and Sabah Electricity Sdn Bhd has notified through an advertisement that the public may review the report from March 31 to April 30, 2008 and written complaints forwarded to the department of environment before May 15.
The cabinet’s decision was immediately welcomed by the Lahad Datu Environment Action Committee chairman Wong Tack who together with villagers and the local business community had opposed the coal plant project in view of health risks and environmental concerns.
Musa said that TNB will be asked to look for alternative sources of energy aside from coal as well as an alternative site away from Darvel Bay.
“I know some say that with today’s technology, the proposed plant is safe and clean but some experts also disagree with this.
“But after careful consideration, we just cannot take the risk and destroy the environment that is intact. We need to look for more environmentally-friendly sources of energy,” he added.
Darvel Bay, Musa said has been described by the scientific world as the “Cradle of Coral Evolution” as the location is the start of coral reefs running through from the Suluwesi Sea to the Great Barrier Reef in Australia.
“We still have untouched environment. We cannot trade off the environment for progress and deprive future generations of Sabah their natural wonders,” he added."
| ||||||||||||||||||||||||
| ||||||||||||||||||||||||
:: show preview : asia's largest event for the water & wastewater industry | ||||||||||||||||||||||||
You are invited to join over 10,000 industry professionals at the Asiawater 08 held at the Kuala Lumpur Convention Centre from 1 - 3 April 2008. This event, recognized as the biggest industry event in the region is all set welcome over 10,000 delegates and trade buyers from across Asia and the Middle-East. | ||||||||||||||||||||||||
|