Thermocouple Specifications
Specifications:
- Type K
- Diameter 6mm
- 8'' length
We need to purchase a few pieces of this thermocouple...
- Type K
- Diameter 6mm
- 8'' length
We need to purchase a few pieces of this thermocouple...
Saturday, May 24, 2008
Friday, May 23, 2008
Acid HCL Dosing Valve - Saunders Delivered
Acid HCL Dosing Valve - Saunders just delivered today. This is replacement for the Alfa Laval EC.
Friday, May 16, 2008
Pressure Gauge Looks at Electrochlorination Plant
These are the pressure gauge photos that we take from Electrochlorination Plant. The specifications are as before.
Thursday, May 15, 2008
New Pressure Gauge to Purchase
Item : Pressure Gauge
Manufacturer : Chem Resist
Dial gauge : 4”
Connection : ½” NPT
Type : Direct bottom
Range : 0-11 bar/160 psi
Complete gauge guard PTFE diaphragms
Item : Pressure Gauge
Manufacturer : Wika
Dial gauge : 4”
Range : 0-1 bar
Fitting : 3/8"
Type : Direct bottom
Glycerin fill
Item : Pressure Gauge
Manufacturer : Wika
Dial gauge : 4”
Range : 0-4 bar
Fitting : 3/8"
Type : Direct bottom
Glycerin fill
Item : Pressure Gauge
Manufacturer : Wika
Dial gauge : 4”
Range : 0-6 bar
Fitting : 1/2"
Type : Direct bottom
Glycerin fill
All of these gauges are used at the Electrochlorination Plant and Bandscreen area.
Tuesday, May 13, 2008
How to check the Controlway Daughter board P/N: ABB-IMMFP12
How to check the DCS Controlway Daughter board P/N? : Refer to the below photo.
DCS Controlway Daughter Board P/N on the above module, ABB factory mentioned that certain batch of this modules might accidentally shipped with a no good daughterboard version. That's why they need to check this serial no again and send back to the factory for their justification.
Monday, May 12, 2008
Introduction to Analyzer Monitoring System in Our Power Station
Basically this is analyzer monitoring system that we have in our power station. There are three type or system of analyzer;
1) Water Quality System
2) Combustion Emission System
3) Environment Air Quality System
After this, I will describe one by one from the above listed. Maybe I will start first for the water quality analyzer system which I familiar so much but later not in this post.
1) Water Quality System
2) Combustion Emission System
3) Environment Air Quality System
After this, I will describe one by one from the above listed. Maybe I will start first for the water quality analyzer system which I familiar so much but later not in this post.
Abandoned Seaholm Power Plant Town Lake in Austin, Texas
The Seaholm Power Plant sits on an eight-acre site on the north shore of Town Lake in Austin, Texas. The plant no longer generates power for the City. Private sector groups have recommended that Seaholm be converted to civic or cultural uses. In 1991, the City Council resolved to preserve Seaholm for public use after it is decommissioned.