Sunday, September 7, 2008

ABB TZID and TZIDC Project

Now we have some project improvement to the plant equipment. This time we are going to change some valve positioner to the ABB TZID positioner. Before this, we have the trial unit and the result is satisfied. For the starting, the list below is a part of the ABB project.

1) LP Bypass
TZID-C (Single acting, fail safe) Positioner
4-20mA Feedback signal

Installation:
  • Mounting bracket suitable for the blackborough valve
  • Installation material
  • Fitting and tubings copper material
2) Feedwater Regulator
TZID-C (single acting, fail safe) Positioner
4-20mA Feedback signal
Proximity switch N/C

Installation:
  • Mounting bracket suitable for the blackborough valve
  • Installation material
  • Fitting and tubings copper material
3) Boiler Blowdown
TZID-C (single acting, fail safe) Positioner
4-20mA Feedback signal
Limit switch

Installation:
  • Mounting bracket suitable for the blackborough valve
  • Installation material
  • Fitting and tubings copper material
4) Soot Blower
TZID Remote Positioner
4-20mA Feedback signal

Installation:
  • Mounting bracket suitable for the blackborough valve
  • Installation material
  • Fitting and tubings copper material
5) TZID-C Positioner (Spare)
V18345.10.1.0.1.2.1.00.1

(ABB SmartVision Software and LKS adapter will be include to this offer)

The rest will be updated later. So don't miss out!