Monday, May 16, 2011

Hydroelectric in Malaysia

Terengganu Hydroelectric Dam 400MW installed capacity
  • Sultan Mahmud Power Station 4X100MW

Cameron Highlands Dam 262MW installed capacity
  • Jor Dam 100MW
  • Woh Dam 150MW
  • Odak Dam 4.2MW
  • Habu Dam 5.5MW
  • Kampung Raja Dam 0.8MW
  • Kampung Terla Dam 0.5MW
  • Robinson Falls Dam 0.9MW
Sungai Perak Hydroelectric Dam installed capacity
  • Bersia Dam 72MW
  • Chenderoh Power Station 40.5MW
  • Kenering Power Station 120MW
  • Sungai Piah upper dam 14.6MW
  • Sungai Piah lower dam 54MW
  • Temenggor Power Station 348MW