Instrumentation and Process Control
The Real Instrumentation and Process Control Engineering Blog Purposely Built for Education.
Friday, January 3, 2014
Sultan Iskandar Power Station
Sultan Iskandar Power Station or Pasir Gudang
Power Station is located at Pasir Gudang Johor.
Type of Plant
Thermal (2 ST), combined cycle (2 GT, 1 ST), open cycle (2 GT)
Construction of the plant began in 1977 and completed in 1980. The station was officially opened in September 1981 by H.R.H Sultan Iskandar of Johor.
‹
›
Home
View web version