The Real Instrumentation and Process Control Engineering Blog Purposely Built for Education.
Friday, January 10, 2014
Friday, January 3, 2014
Sultan Iskandar Power Station
Sultan Iskandar Power Station or Pasir Gudang
Construction of the plant began in 1977 and completed in 1980. The station was officially opened in September 1981 by H.R.H Sultan Iskandar of Johor.
Power Station is located at Pasir Gudang Johor.
Type of Plant
| Thermal (2 ST), combined cycle (2 GT, 1 ST), open cycle (2 GT) |
Subscribe to:
Posts (Atom)
