Showing posts with label Summary Report. Show all posts
Showing posts with label Summary Report. Show all posts

Sunday, March 30, 2008

Blog Summary On The instrumentations.blogspot.com 30th March 2008

I am posting early this entry because next week I will be away from my power station due to some matters. Meaning that there will no post articles during few next days. Hopefully you enjoy to continue reading on this weblog.

The following list is my entry post for entire month of February 2008, hoping that my blog readers will not miss my posts;

- Level Transmitter New Project at the ECP
- Parts of IT
- Pressure Gauge
- Power Plant Story
- Mill MC3 Touch Screen Display
- Druck 1830 Level Pressure Sensor
- Fly Ash Silo
- Chempura CFA-1000 Rosemount Sodium Analyzer
- Valve and Fitting
- Allen Bradley PLC
- Thermo Ramsey Granuflow Detector GTR-130
- Foxboro Malaysia
- Bently Nevada 3500 Series Monitoring System
- Brodersen Control

Related articles you may read;
- January Summary Report
- February Summary Report

Sunday, March 2, 2008

Blog Summary On instrumentations.blogspot.com 29th March 2008

It's time for me to do summary on this instrumentations.blogspot.com. Goodbye February 2008 and welcome March 2008. Meaning that my weblog already 2 months old. The following list is my entry post for entire month of February 2008, hoping that my blog readers will not miss my posts;

- Power-Gen Asia Conference and Exhibition 21-23 October 2008
- New Pressure Gauge to be fitted at the Condenser Inlet Pipe
- Endress Hauser Cerabar M PMP48
- Trial Instrumentation at the Electrochlorination Plant
- New Canon Digital Camera Ixus 960
- Chernobyl Nuclear Power Plant Disaster
- Portable pH Calibrator
- Beamex MC5 Fieldbus Calibrator
- Boiler Function Block
- Turbine Function Block
- Heat Exchanger
- Hydroponic pH Meter Application
- Digital Temperature Transmitter
- Beautiful Night Scene at Coal Fired Power Plant
- Nokia 2100
- Arizona Solar Power Plant
- Introduction to Coal Fired Power Plant

Compared with the January posts, February is less because I am on leave about one week. Went back to my hometown during Chinese New Year. I'll try my best to post some new category this month in this weblog. Hope you will enjoy. And one more thing is your suggestion are welcome to improve my blog. Thanks.

Friday, February 1, 2008

Blog Summary On instrumentations.blogspot.com January 31, 2008

The first month of January 2008 had just passed. At the end of each month, I need to submit my report to my immediate supervisor. There is an official format report must be follow. I am not going to put all of my monthly reports here. But just put the summary report on this Instrumentation and Process Control blog so that you can make quick review what was happened in our Coal Fired Power Plant January 2008. This summary report does not mean the actual report for the month because some confidential parts cannot be revealed. The following list is my entry post for the entire month of January;
  1. Manjung Coal Fired 3X700 MW Power Plant on Project Description
  2. Electro Chlorination Plant Flow Switch Problem
  3. Proposal of New Waltron Sodium Analyser 9001 Series at Water Treatment Plant
  4. Purpose of Water Quality Analyser System in Power Plant
  5. Generator Stator Vibration Spikes
  6. Feed Water Tank Differential Pressure Gauge Unit and Range Change
  7. Microrec Problem
  8. Bunker Level Transmitter Faulty
  9. Washdown Water Sump Level Switch Problem
  10. Band Screen Guide Radar and Hydrostatic Level Transmitter
  11. Generator Panel Alarm on Conductivity Analyser
  12. Electro Chlorination Plant New Flow Switch Project
  13. Water Treatment Plant Acid Day Tank Magnetic Level Switch Faulty
  14. ABB Water Analyser New Purchasing List
  15. Coal Bunker Level Transmitter Problem
  16. Generator RTDs Converter To Purchase: Brand WIKA
  17. GP Joran Coal Fired Power Plant January 2008
  18. LP Heater 4 Normal Level Control Valve Diaphragm Leak
  19. Lumut Power Plant
  20. Steam Turbine
  21. Generator Hydrogen Gas Cooling System
All things that happened which I think can be put in this blog on daily work basis still continue. My blog Instrumentation and Process Control also will doing summary report on continuing monthly basis at the end or early month so that my blog readers will not miss it. Enjoy this reading!

Related Posts with Thumbnails