Tuesday, January 29, 2008

Lumut or Segari Power Plant

Lumut Power Plant

Lumut Power Plant and also known Segari Power Plant is a combine cycle power plant. Owned by Segari Energy Ventures Sdn Bhd (SEV), a subsidiary company of Malakoff Berhad. Located at Mukim Pengkalan Baru, District of Manjung in Lumut Perak with 80 acre site on old tin mining land. It is located 30 km from Manjung Coal Fired 3X700 MW Power Plant which owned by Tenaga Nasional Berhad. Segari combine cycle power plant is designed with net output 1,300 MW power generation making it is the biggest gas fired power plant in Malaysia.
To comply with the Department of Environment Malaysia (DOE), Segari Power Plant is designed with the latest technology to reduce emissions and effluents below the good level requirement. 

Generally, Segari or Lumut Power Plant is made up of two identical 650MW blocks. Each consisting of three 143MW ABB GT13E2 gas turbines, three ABB CE natural circulation HRSGs and one ABB 231MW double casing condensing steam turbine generator unit.
Related Posts with Thumbnails